02 / 02 New build services

Block of Flats Construction

Building flats is a different job from building a single house. There are more homes to deliver, stricter fire and sound rules between them, shared parts of the building to plan for, and usually a developer, lender or investor who needs the scheme finished to programme and budget. We work as the main contractor for new blocks of flats and small residential developments, from groundworks to finished, certified units ready for sale or letting.

This page covers building flats. For the general new build process, approvals and structural warranties, see our new builds page. For a single house, see our new build homes service.

Block of Flats Construction
  • Part ofNew Builds
  • Our process8 clear steps
  • Answered here6 common questions
  • FreeSurvey & itemised quote

01Who we build for

Who We Build Flats For

  • Landowners: You have a site or an existing building to replace, and planning permission for flats, or are applying for it.
  • Developers: You need a main contractor to build a scheme from your architect's drawings to an agreed programme.
  • Investors and landlords: You are building flats to let and want the units finished, certified and ready for tenants.

We work with your architect, structural engineer, quantity surveyor and other consultants, and give you a single itemised quote and programme for the construction.

02What is included

What Building a Block of Flats Includes

  • Groundworks and foundations: Site clearance, drainage runs, service ducts and foundations. Heavier buildings on London clay often need piling contractors.
  • Drainage: Foul and surface water drainage, laid by our drain installation and replacement team.
  • Structure and envelope: Walls, floors between flats, the roof, windows and external doors, until the building is weathertight.
  • Fire separation: Fire-resisting walls and floors between flats, fire-stopping around pipes and cables, and fire doors.
  • Services to each flat: Separate supplies and meters, wiring through our domestic electrical installation service, and heating through our central heating system installation service.
  • Fire detection: Smoke and heat alarms in each flat and any system the fire strategy requires, through our fire alarm installation and maintenance service.
  • Fit-out: Kitchens, bathrooms, tiling, flooring and decoration in every unit.
  • Common parts and external works: The entrance, stairs and landings, bin and cycle stores, parking, EV charger installation and landscaping.

03Planning

Do I Need Planning Permission to Build Flats?

Yes. A new block of flats always needs full planning permission. In London, the council and the London Plan set standards that shape how many flats you can build and how they are laid out:

  • Space standards: Minimum internal floor areas and storage for each flat, based on the number of bedrooms and occupants.
  • Outdoor space: Private outdoor space, such as a balcony or garden, for each flat.
  • Accessibility: Most new homes must meet the accessible and adaptable standard, and some larger schemes must include wheelchair user homes.
  • Design and neighbours: Height, massing, overlooking, daylight and the effect on the street.
  • Parking, cycles and refuse: Many London sites are car-free or car-light, with secure cycle storage and bin stores.
  • Charges and obligations: The Community Infrastructure Levy, the Mayoral CIL in London and, on larger schemes, a Section 106 agreement, which may include affordable housing.

Some other ways of creating flats, such as converting certain commercial buildings, can use permitted development with prior approval, but that is a different route from building a new block. Your architect or planning consultant will advise on the right route for your site.

04Fire safety

Fire Safety in New Blocks of Flats

Fire safety is where flats differ most from houses. Part B of the building regulations sets out the main requirements, and each scheme has its own fire strategy. Typical measures include:

  • Compartmentation: Each flat is a fire-resisting box, separated from its neighbours and the common parts.
  • Protected escape route: A protected common stair and corridors, with smoke ventilation where needed.
  • Fire doors: Fire-resisting, self-closing flat entrance doors and doors to the stair.
  • Fire-stopping: Every gap where pipes, cables and ducts pass through walls and floors is sealed.
  • Sprinklers: New blocks of flats with a top storey 11 metres or more above ground level need sprinkler systems.
  • Emergency lighting and signs in the common parts.

Fire-stopping and fire doors are often hidden once the building is finished, so we record them as the work goes on, for building control and for the building's owner.

05Sound

Sound Insulation Between Flats

Flats must meet the sound insulation requirements of Part E of the building regulations, for walls and floors between homes. This is checked by pre-completion sound testing of a sample of walls and floors, unless an approved Robust Details construction is used and registered. Good detailing matters: the floor build-up, the wall construction and the way services pass between flats all affect the result. We build to the specified details so the building passes first time.

06Contract

What Contract Is Used to Build Flats?

Most residential developments in England are built under a standard form of building contract, most often from the JCT (Joint Contracts Tribunal) suite. The common choices are:

  • JCT Design and Build Contract: The contractor takes on responsibility for completing the design, usually after planning, alongside building it.
  • JCT Intermediate Building Contract: The client's architect completes the design, and the contractor builds it. This often suits smaller, straightforward schemes.
  • JCT Standard Building Contract: For larger or more complex traditional projects, with detailed drawings and bills of quantities.

The contract sets out the price, the programme, how the work is valued and paid for in stages, how changes are handled, and what happens at completion and during the defects period. Your quantity surveyor or legal adviser will recommend the right form, and we price and programme to it.

07Building Safety Act

Building Safety Act Duties on Flats Projects

Since October 2023, every building project in England has named dutyholders under the building regulations: the client, the principal designer and the principal contractor. Each must be competent for their role and make sure the work complies. On a block of flats, we act as the principal contractor for the construction, planning, managing and monitoring the building work and handing over the information the owner needs to run the building safely. The same roles apply for health and safety under the CDM Regulations 2015.

Taller buildings, of at least 18 metres or seven storeys with two or more homes, are higher-risk buildings. They need approval from the Building Safety Regulator before work starts and before they can be occupied.

08Cost

How Much Does It Cost to Build a Block of Flats?

Every scheme is priced from the drawings, the specification and a site visit, and you receive a written, itemised quote. The main factors are:

Your quote, itemised

Every factor is priced line by line after your free survey — no guesswork, staged payments.

Discuss your development
  1. 01

    Number and size of flats, and the number of storeys.

  2. 02

    Ground conditions and foundations, including piling.

  3. 03

    Structural frame and method

    Masonry, timber frame, steel or concrete frame.

  4. 04

    Fire and sound requirements

    Compartmentation, fire doors, sprinklers and acoustic floors.

  5. 05

    Specification

    Kitchens, bathrooms, flooring, windows and finishes.

  6. 06

    Heating and energy systems

    Individual or communal.

  7. 07

    Site access and logistics

    Tight London sites, deliveries, cranes and neighbours.

  8. 08

    Utilities, external works and charges

    Connections, drainage, landscaping, CIL, Section 106 and warranty.

Timescale · 09

How Long Does It Take to Build a Block of Flats?

It depends on the number of flats and storeys, the construction method, the site and the ground conditions. Planning, discharging pre-commencement conditions, technical design, the warranty and utility applications all come first. Once on site, the programme runs from groundworks through the structure to fit-out of every unit and the common parts. We agree a detailed programme with you before work starts.

10Process

Our Flats Building Process

Planned before we start, managed by one project manager, signed off at the end.

  1. 01

    Site visit and drawing review

    The site, access, ground and your planning drawings.

  2. 02

    Pricing and programme

    An itemised quote and a programme, based on the drawings and specification.

  3. 03

    Contract and pre-start

    The building contract, dutyholder appointments, warranty, building regulations, utilities and planning conditions.

  4. 04

    Groundworks and foundations

    Clearance, drainage, ducts and foundations.

  5. 05

    Structure and envelope

    Frame, floors, roof, windows and doors.

  6. 06

    Services and fire safety

    First fix, fire separation and fire-stopping, then plastering.

  7. 07

    Fit-out

    Kitchens, bathrooms, flooring and decoration in each flat, plus the common parts.

  8. 08

    Testing and handover

    Sound and air tests, commissioning, completion certificates, warranty sign-off and building information.

11Areas

Building Flats Across London

We build flats across London, with a focus on east and south-east London. Find out more on our pages for building flats in London, building flats in Ilford, building flats in Barking, building flats in Dagenham, building flats in East Ham and building flats in Orpington.

12FAQs

Building Flats FAQs

Ask a different question
Q01

How much does it cost to build a block of flats?

It depends on the number and size of the flats, the storeys, the foundations, the construction method, the fire and sound requirements and the specification. We price each scheme from the drawings and a site visit, with a written, itemised quote.

Q02

Do I need planning permission to build flats?

Yes. A new block of flats always needs full planning permission. In London, schemes must meet space, outdoor space, accessibility and design standards, and may involve CIL and a Section 106 agreement.

Q03

How long does it take to build a block of flats?

It depends on the size of the scheme, the method and the site. Planning, conditions and technical design come first. Your quote includes a programme from groundworks to handover.

Q04

What contract is used to build flats?

Usually a JCT contract: most often the Design and Build Contract, the Intermediate Building Contract or, for larger schemes, the Standard Building Contract. Your quantity surveyor or legal adviser recommends the form.

Q05

What fire safety rules apply to a new block of flats?

Part B of the building regulations: each flat must be fire-separated, with a protected escape route, fire doors and fire-stopping. Blocks with a top storey 11 metres or more above ground need sprinklers.

Q06

Do you build mixed-use buildings with shops below?

Yes. Flats above ground-floor commercial units can be built as one project. For the commercial units, see our commercial construction service.

Next step

Talk to Us About Your Development

Send us your planning drawings, consent or site details. We will review the scheme, visit the site and send you a written, itemised quote and programme.

You can also use our contact form.

Building Flats — finished project
  • Free survey
  • Itemised written quote
  • One project manager