01 / 04 Renovation services

Full House Renovations

A full house renovation brings a whole home up to date in one planned project. It may involve new wiring, plumbing and heating, changes to the layout, a new kitchen and bathroom, repaired plaster and floors, and decoration throughout. It suits houses that have been neglected, newly bought properties that need everything doing, and homes being prepared to rent or sell.

We are a whole house renovation company that manages every trade under one programme, as part of our renovations and refurbishments service. You deal with one project manager, one schedule of works and one quote.

Full House Renovations
  • Part ofRenovations & Refurbishments
  • Our process8 clear steps
  • Answered here6 common questions
  • FreeSurvey & itemised quote

01What is included

What a Full House Renovation Can Include

  • Structural work: Removing or moving walls with steel beams, repairing floors and joists, and dealing with damp and movement. Where foundations need strengthening, this is done by our underpinning contractors.
  • Rewiring: A full or partial rewire and a new consumer unit, through our domestic electrical installation service.
  • Replumbing and heating: New pipework, including replacing old lead pipes, and a new heating system through our central heating system installation service.
  • Kitchen and bathrooms: See our kitchen renovation and bathroom renovation pages.
  • Plastering, floors and joinery: New plaster, repaired or new floors, doors, skirting and staircases.
  • Energy improvements: Insulation, new windows and efficient heating controls.
  • Decorating: Painting, wallpaper and finishing throughout, through our decorating services.

For period homes, see our period property restoration service, which covers repairing original features.

02Before you start

Before You Start: Surveys and Planning

A full house renovation goes best when the problems are found before the work begins. Before we price the job, we look at:

  • Structure: Cracks, sagging floors, removed walls and roof condition.
  • Damp and timber: Rising or penetrating damp, rot and woodworm.
  • Services: The age of the wiring, pipework, boiler and drains, checked where needed with a CCTV drain survey.
  • Asbestos: Homes built before 2000 may contain asbestos, so a survey is arranged before disturbing materials that could contain it.
  • Approvals: Building regulations for structural and electrical work, and planning or listed building consent where needed.

Everything is written into a schedule of works, room by room. That schedule forms the basis of your quote and programme. We also recommend keeping a contingency in your budget for problems hidden behind walls and under floors.

03Room order

What Order to Renovate a House, Room by Room

The work on each room follows the trade sequence of first fix, plaster and second fix. The order of the rooms matters too:

  1. 1

    Whole-house systems first: the roof, structural repairs, damp treatment, the new consumer unit and the main heating and water pipework run through every room. They need to be done before any single room is finished.

  2. 2

    Kitchen and bathrooms next: these rooms have the most pipework, wiring and waste. Finishing them early gives you working facilities sooner.

  3. 3

    Work from the top down: upper floors are finished before lower floors, so dust, debris and tradespeople do not pass through rooms that are already complete.

  4. 4

    Bedrooms and living rooms: plastering, flooring and decoration once the messy work nearby is done.

  5. 5

    Hallway and stairs last: they are the main route for materials and trades, so they are decorated and carpeted at the very end.

We plan this sequence in your programme, so each trade follows the last without gaps or rework.

04Living in

Can You Live in a House During a Renovation?

Sometimes, but for a full renovation it is often easier to move out. When the whole house is being rewired and replumbed, there will be days without power, water or heating, and dust and noise throughout. Living elsewhere usually makes the work quicker and safer, especially with young children or anyone with health conditions.

If you need to stay, we can phase the work. That means finishing and sealing off parts of the house in stages, keeping one bathroom working and setting up a temporary kitchen. It takes careful planning and usually adds time, and we tell you honestly what to expect.

05Cost

How Much Does a Full House Renovation Cost?

Every full renovation is priced from a survey and a schedule of works, and you receive a written, itemised quote, room by room. The main factors are:

Your quote, itemised

Every factor is priced line by line after your free survey — no guesswork, staged payments.

Book a free renovation survey
  1. 01

    The size of the house and the number of rooms.

  2. 02

    The condition of the property

    How much rewiring, replumbing, damp and structural work is needed.

  3. 03

    Layout changes

    Removing or moving walls, and relocating the kitchen or bathrooms.

  4. 04

    Kitchen and bathroom specification.

  5. 05

    Heating system

    A new boiler, radiators or underfloor heating.

  6. 06

    Windows, doors, floors and joinery.

  7. 07

    Finishes and decoration.

  8. 08

    Fees

    Structural calculations, building control, surveys and any consents.

Timescale · 06

How Long Does a Full House Renovation Take?

It depends on the size of the house, how much work it needs and whether you are living there during the work. A cosmetic refresh of the whole house is far quicker than a renovation back to brick, with rewiring, replumbing and structural changes. Lead times for kitchens, windows and bespoke joinery also affect the programme. Your quote includes a programme showing each stage and room.

Project management · 07

One Project Manager, One Programme

On a full house renovation, the difference between a smooth project and a stressful one is usually coordination. We manage every trade ourselves, following the schedule of works, with one named contact who keeps you updated. Building control inspections, electrical and gas certificates and the final sign-off are all handled as part of the project.

08Process

Our Full House Renovation Process

Planned before we start, managed by one project manager, signed off at the end.

  1. 01

    Free survey

    A walk-round of the whole house, noting condition, problems and your plans.

  2. 02

    Investigations

    Structural, damp, drain and asbestos checks where needed.

  3. 03

    Schedule of works and quote

    A room-by-room schedule, an itemised quote and a programme.

  4. 04

    Approvals

    Building regulations, and planning or listed building consent where needed.

  5. 05

    Strip-out and structural work

    Removing old finishes, then structural, roof and damp repairs.

  6. 06

    First fix, plastering and second fix

    Wiring, plumbing and heating, then plaster, then fittings.

  7. 07

    Kitchen, bathrooms and finishing

    Fitting, tiling, flooring, joinery and decorating.

  8. 08

    Sign-off and handover

    Certificates, building control completion and a full walk-round.

09Areas

Full House Renovations Across London

We carry out full house renovations across London, with a focus on east and south-east London. Find out more on our pages for full house renovation in London, full house renovation in Ilford, full house renovation in Barking, full house renovation in Dagenham, full house renovation in East Ham and full house renovation in Orpington.

10FAQs

Full House Renovation FAQs

Ask a different question
Q01

How much does a full house renovation cost?

It depends on the size of the house, its condition, any layout changes, and the kitchen, bathroom and finish you choose. We give you a fixed, itemised quote based on a room-by-room schedule of works after a free survey.

Q02

How long does a full house renovation take?

A whole-house cosmetic refresh is much quicker than a renovation with rewiring, replumbing and structural work. Your quote includes a programme showing each stage and room.

Q03

Can you live in a house during a renovation?

Sometimes, if the work is phased with one bathroom and a temporary kitchen kept working. For a full renovation, moving out is often quicker, safer and less stressful.

Q04

What order should the rooms be renovated in?

Whole-house systems and structural work come first, then the kitchen and bathrooms. Work from the top floor down, and finish the hallway and stairs last, because they are the main route through the house.

Q05

Do I need building regulations for a full house renovation?

For parts of it. Rewiring, new circuits, structural changes, new boilers, replacement windows and new drains need approval or certification. Cosmetic work does not. We arrange everything required.

Q06

Should I set aside a contingency?

Yes. Older homes often reveal hidden problems once walls and floors are opened up. A contingency means these can be fixed without stopping the project.

Next step

Book Your Free Renovation Survey

Tell us about the house and what you want to achieve. We will survey the whole property, flag any hidden problems and send you a written, room-by-room quote.

Send us photos of the house on WhatsApp to get started, or use our contact form.

Full House Renovation — finished project
  • Free survey
  • Itemised written quote
  • One project manager